{"record":{"code":"NG-07238","indicator":"Wbn Notlow","class_b":false,"subject":"LUBELL NIGERIA LIMITED","buyer":"WB P160865 · WB notice OP00345150 NG-GOMBE L-PRES-459542-CW-RFB","amount":2041423585.0299997,"currency":"NGN","records":0,"found":"2026-10-04","refs":["PRES-459542-CW-RFB","2025-02-10"],"id":"NG-07238","html":"https://worldwide-corruption.com/record/nigeria/findings/wbn-notlow/NG-07238/","json":"https://worldwide-corruption.com/record/nigeria/findings/wbn-notlow/NG-07238/index.json","why":"Indicator “Wbn Notlow”: winner «LUBELL NIGERIA LIMITED» evaluated NGN 3,242,853,965.18, evaluated cheaper 1: «NUELLIKA INFINITY LIMITED» (Nigeria) NGN 1,201,430,380.15 (difference NGN 2,041,423,585.03, ×2.70) · WB notice OP00345150 NG-GOMBE L-PRES-459542-CW-RFB (2025-02-10; Request for Bids; project P160865 Livestock Productivity and Resilience Su) «Construction of Ultra Modern Abattoir in Gombe».","facts":[["Company / subject","LUBELL NIGERIA LIMITED",null],["Buyer","WB P160865 · WB notice OP00345150 NG-GOMBE L-PRES-459542-CW-RFB",null],["Indicator","Wbn Notlow",null],["Amount","NGN 2,041,423,585",null],["Found","4 October 2026",null],["Code","NG-07238",null],["Reference","PRES-459542-CW-RFB",null],["Reference","2025-02-10",null]],"summary":"winner «LUBELL NIGERIA LIMITED» evaluated NGN 3,242,853,965.18, evaluated cheaper 1: «NUELLIKA INFINITY LIMITED» (Nigeria) NGN 1,201,430,380.15 (difference NGN 2,041,423,585.03, ×2.70) · WB notice OP00345150 NG-GOMBE L-PRES-459542-CW-RFB (2025-02-10; Request for Bids; project P160865 Livestock Productivity and Resilience Su) «Construction of Ultra Modern Abattoir in Gombe»","entity":"1500b635"},"about":"Indicators computed from public data sets: contracts, payments, registers, trade and sanctions lists. An indicator is a reason to check, not a decision of a public authority.","evidence":[],"row":{"country":"Nigeria","iso2":"NG","part":"Findings","indicator":"Wbn Notlow","about":"Indicators computed from public data sets: contracts, payments, registers, trade and sanctions lists. An indicator is a reason to check, not a decision of a public authority.","findings":307,"new_today":0,"on_pages":307,"full_list":[],"html":"https://worldwide-corruption.com/database/nigeria/findings/wbn-notlow/","json":"https://worldwide-corruption.com/database/nigeria/findings/wbn-notlow/index.json"},"other_records_of_this_company":[],"html":"https://worldwide-corruption.com/record/nigeria/findings/wbn-notlow/NG-07238/","json":"https://worldwide-corruption.com/record/nigeria/findings/wbn-notlow/NG-07238/index.json"}